CONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY

Food Hub Barelang in Batam City is an integrated area that combines agricultural activities, fisheries, culinary tourism, and educational tourism related to food. The Food Hub area consists of 4 separate buildings, which are the Food Hall Main Building, Wet Market, Loading Dock, and Greenhouse. F...

Full description

Saved in:
Bibliographic Details
Main Author: Rizqi Kirana, Shalma
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/77246
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:77246
spelling id-itb.:772462023-08-24T09:03:38ZCONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY Rizqi Kirana, Shalma Indonesia Final Project Main Building Food Hub, construction method, construction scheduling, construction cost estimation. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/77246 Food Hub Barelang in Batam City is an integrated area that combines agricultural activities, fisheries, culinary tourism, and educational tourism related to food. The Food Hub area consists of 4 separate buildings, which are the Food Hall Main Building, Wet Market, Loading Dock, and Greenhouse. For this final project, the focus is on the planning of the Main Building. The Main Building is designed with reinforced concrete as the main material. It comprises 4 floors and 1 semi-basement floor. This final project will include the planning of Construction Engineering Management, which involves site planning, work breakdown structure, construction methods, construction cost estimation, and project scheduling. The Food Hub Barelang project in Batam City consists of several phases, including site preparation, earthworks, substructure works, upper concrete structure works, roof structure works, and road pavement works for access. Each of these phases has specific sub-works to facilitate the construction process. The project is scheduled to run for 202 calendar days and 170 working days, with a direct project cost of Rp 51,656,112,375. The indirect cost is Rp 8,510,744,017. The total Planned Budget Execution (RAP) for the project is Rp 60,166,856,393, while the Estimated Cost Budget (RAB) for the project is Rp 71,598,560,000. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Food Hub Barelang in Batam City is an integrated area that combines agricultural activities, fisheries, culinary tourism, and educational tourism related to food. The Food Hub area consists of 4 separate buildings, which are the Food Hall Main Building, Wet Market, Loading Dock, and Greenhouse. For this final project, the focus is on the planning of the Main Building. The Main Building is designed with reinforced concrete as the main material. It comprises 4 floors and 1 semi-basement floor. This final project will include the planning of Construction Engineering Management, which involves site planning, work breakdown structure, construction methods, construction cost estimation, and project scheduling. The Food Hub Barelang project in Batam City consists of several phases, including site preparation, earthworks, substructure works, upper concrete structure works, roof structure works, and road pavement works for access. Each of these phases has specific sub-works to facilitate the construction process. The project is scheduled to run for 202 calendar days and 170 working days, with a direct project cost of Rp 51,656,112,375. The indirect cost is Rp 8,510,744,017. The total Planned Budget Execution (RAP) for the project is Rp 60,166,856,393, while the Estimated Cost Budget (RAB) for the project is Rp 71,598,560,000.
format Final Project
author Rizqi Kirana, Shalma
spellingShingle Rizqi Kirana, Shalma
CONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY
author_facet Rizqi Kirana, Shalma
author_sort Rizqi Kirana, Shalma
title CONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY
title_short CONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY
title_full CONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY
title_fullStr CONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY
title_full_unstemmed CONSTRUCTION MANAGEMENT PLANNING OF MAIN BUILDING FOOD HUB BARELANG, BATAM CITY
title_sort construction management planning of main building food hub barelang, batam city
url https://digilib.itb.ac.id/gdl/view/77246
_version_ 1822008218948206592