PENGEMBANGAN SISTEM PENJADWALAN INTERAKTIF UNTUK PRODUKSI JOB SHOP DENGAN MENGGUNAKAN ALGORITMA GENETIKA PADA CV CIPTA SINERGI MANUFACTURING
CV Cipta Sinergi Manufacturing (CV CSM) is a manufacturing company that produces machinery products based on Make-To-Order (MTO) method. CV CSM has a monthly on time delivery target of 90%. However, this target has not yet been achieved in January until March 2023. The cause of production delay i...
Saved in:
Main Author: | Mazaya Awanis, Nurshadrina |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/77525 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
JOB SHOP SCHEDULING MODEL PROPOSAL TO MINIMIZE TARDINESS IN CV CIPTA SINERGI MANUFACTURING
by: ATIYA NIM 13414105, HANAYA -
ALGORITMA PENJADWALAN JOB SHOP DETERMINISTIK BERBASIS MATRIKS
by: S. TANUMIRARDJA, YEYEN -
PROPOSED ORDER ACCEPTANCE SYSTEM BASED ON CAPACITY PLANNING IN CV. CIPTA SINERGI MANUFACTURING
by: TANJUNG (NIM : 134 1 3004), ADYATAMI -
PENGEMBANGAN METODE PENJADWALAN PRODUKSI PADA AREA SHEET METAL PT DIRGANTARA INDONESIA MENGGUNAKAN ALGORITMA GENETIKA
by: Prasasti Asshafah Tan, Vini -
OPTIMASI PENJADWALAN PREVENTIVE MAINTENANCE PADA MESIN PRODUKSI OBH COMBI DI PT COMBIPHAR MENGGUNAKAN ALGORITMA GENETIKA
by: Thessalonika, Samantha