DIGITALIZATION OF FORWARD SCHEDULING IN JOB SHOP PRODUCTION AREA USING HIGH PRIORITY ORDER CASE

In the production system, there are two types of events, namely predictable events and unpredictable events. Unforeseen types of events can disrupt the production process which results in non-fulfillment of production targets. One type of event that cannot be predicted is the entry of a high priorit...

Full description

Saved in:
Bibliographic Details
Main Author: Ramadhan Indra Permana, Gian
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/77882
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items