DIGITALIZATION OF FORWARD SCHEDULING IN JOB SHOP PRODUCTION AREA USING HIGH PRIORITY ORDER CASE
In the production system, there are two types of events, namely predictable events and unpredictable events. Unforeseen types of events can disrupt the production process which results in non-fulfillment of production targets. One type of event that cannot be predicted is the entry of a high priorit...
Saved in:
Main Author: | Ramadhan Indra Permana, Gian |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/77882 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LITERATURE REVIEW OF HIGH-GRADE INDUSTRIAL SALT PRODUCTION USING MEMBRANE TECHNOLOGY
by: Wahyu Ramadhan, Muhammad -
FLOOD CONTROL IN BENGKURING AREA, SEMPAJA TIMUR, SAMARINDA CITY
by: Defasha Asyira Prameswari, Aji -
ANALYSIS OF COMMUNITY PARTICIPATION IN THE DEVELOPMENT OF SITU GUNUNG RESORT AS A NATURAL TOURISM AREA
by: Aprilia Yusuf, Hana -
LITERATURE REVIEW OF HIGH-GRADE INDUSTRIAL SALT PRODUCTION USING MEMBRANE TECHNOLOGY
by: Purnomo Ajie, Lintang -
DEVELOPMENT OF A DIGITAL TRANSFORMATION MODEL FOR FOOD AND BEVERAGE SMES DURING PANDEMIC CONSIDERING LEADERSHIP, ORGANIZATIONAL AGILITY, AND THEIR IMPACT ON SMES PERFORMANCE
by: Sidabutar, Apriliene