PROJECT MANAGEMENT ASSESSMENT AND IMPLEMENTATION PLAN IN CONSTRUCTION ENGINEERING CONSULTANCY COMPANY (CASE STUDY: PT PETRA PENIDA ENERGI

PT Petra Penida Energi Indonesia is a construction engineering consultancy company. In carrying out the project, timely completion of the project and within the budget are two important things that must be maintained. In the 2018-2020 period, there were 21 projects that experienced issues that made...

Full description

Saved in:
Bibliographic Details
Main Author: Christovel, Delano
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/78062
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:78062
spelling id-itb.:780622023-09-18T07:47:20ZPROJECT MANAGEMENT ASSESSMENT AND IMPLEMENTATION PLAN IN CONSTRUCTION ENGINEERING CONSULTANCY COMPANY (CASE STUDY: PT PETRA PENIDA ENERGI Christovel, Delano Indonesia Theses Project Management, Assessment, Engineering INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/78062 PT Petra Penida Energi Indonesia is a construction engineering consultancy company. In carrying out the project, timely completion of the project and within the budget are two important things that must be maintained. In the 2018-2020 period, there were 21 projects that experienced issues that made them delayed and over budget. For this reason, it is necessary to conduct research to find out what are the main factors that influence the delayed completion time and over budget, and to provide recommendations to prevent project delayed and over budget. Primary data was collected using a questionnaire to PPE Indonesia employees. The factors used in the questionnaire are Employees (X1), Clients (X2), Data (X3), Communication (X4), and Monitoring (X5) towards project timeline and budget. Data analysis used Multiple Linear Regression to estimate how the dependent variable have relationship to the independent variable. From the results of the analysis, it is obtained that Employees (X1), Clients (X2), and Monitoring (X5) are 3 variables that have a significant relationship on results, based on a significant value of less than 0.05. While the data variables (X3) and communication (X4) have no significant relationship on the results. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PT Petra Penida Energi Indonesia is a construction engineering consultancy company. In carrying out the project, timely completion of the project and within the budget are two important things that must be maintained. In the 2018-2020 period, there were 21 projects that experienced issues that made them delayed and over budget. For this reason, it is necessary to conduct research to find out what are the main factors that influence the delayed completion time and over budget, and to provide recommendations to prevent project delayed and over budget. Primary data was collected using a questionnaire to PPE Indonesia employees. The factors used in the questionnaire are Employees (X1), Clients (X2), Data (X3), Communication (X4), and Monitoring (X5) towards project timeline and budget. Data analysis used Multiple Linear Regression to estimate how the dependent variable have relationship to the independent variable. From the results of the analysis, it is obtained that Employees (X1), Clients (X2), and Monitoring (X5) are 3 variables that have a significant relationship on results, based on a significant value of less than 0.05. While the data variables (X3) and communication (X4) have no significant relationship on the results.
format Theses
author Christovel, Delano
spellingShingle Christovel, Delano
PROJECT MANAGEMENT ASSESSMENT AND IMPLEMENTATION PLAN IN CONSTRUCTION ENGINEERING CONSULTANCY COMPANY (CASE STUDY: PT PETRA PENIDA ENERGI
author_facet Christovel, Delano
author_sort Christovel, Delano
title PROJECT MANAGEMENT ASSESSMENT AND IMPLEMENTATION PLAN IN CONSTRUCTION ENGINEERING CONSULTANCY COMPANY (CASE STUDY: PT PETRA PENIDA ENERGI
title_short PROJECT MANAGEMENT ASSESSMENT AND IMPLEMENTATION PLAN IN CONSTRUCTION ENGINEERING CONSULTANCY COMPANY (CASE STUDY: PT PETRA PENIDA ENERGI
title_full PROJECT MANAGEMENT ASSESSMENT AND IMPLEMENTATION PLAN IN CONSTRUCTION ENGINEERING CONSULTANCY COMPANY (CASE STUDY: PT PETRA PENIDA ENERGI
title_fullStr PROJECT MANAGEMENT ASSESSMENT AND IMPLEMENTATION PLAN IN CONSTRUCTION ENGINEERING CONSULTANCY COMPANY (CASE STUDY: PT PETRA PENIDA ENERGI
title_full_unstemmed PROJECT MANAGEMENT ASSESSMENT AND IMPLEMENTATION PLAN IN CONSTRUCTION ENGINEERING CONSULTANCY COMPANY (CASE STUDY: PT PETRA PENIDA ENERGI
title_sort project management assessment and implementation plan in construction engineering consultancy company (case study: pt petra penida energi
url https://digilib.itb.ac.id/gdl/view/78062
_version_ 1822008462147584000