UPRATING THE CAPACITY OF WATER TREATMENT PLANT 3 CIKONENG CIPARAY PDAM TIRTA RAHARJA BANDUNG DISTRICT
PDAM Tirta Raharja has eight Water Treatment Plants which includes Cikoneng Ciparay WTP. The Cikoneng Ciparay Water Treatment Plant consists of WTP 1, WTP 2 and WTP 3 with a capacity of 200 l/s, 50 l/s and 150 l/s.Along with the increasing population in Bandung districts, it is comparable to the inc...
Saved in:
Main Author: | Maharani Chalifah, Revani |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/78097 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
REVIEW AND REDESIGN WATER TREATMENT PLANT OF PDAM TIRTA RAHARJA CIKONENG KABUPATEN BANDUNG
by: NIM: 15314048, FEBRIANSYAH -
UPRATING THE COAGULATION, FLOCCULATION, AND SEDIMENTATION UNITS AT SUKAMAJU WATER TREATMENT PLANT (WTP) PDAM TIRTA RAHARJA BANDUNG DISTRICT
by: FAZRIANI RUSMANA, YUNIAR -
REVIEW AND REDESIGN OF FILTRATION, RESERVOIR, AND DISINFECTION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG
by: SIDOPAMUNGKAS SONBERS (NIM: 15313014), KORRY -
REVIEW AND REDESIGN OF COAGULATION, FLOCCULATION AND SEDIMENTATION UNITS AT CIKONENG WATER TREATMENT PLANT UNIT 3 PDAM TIRTA RAHARJA KABUPATEN BANDUNG
by: Adhaninggar Dyah Lukitaningrum (NIM: 15313067), Vidya -
UPRATING FILTRATION, DISINFECTION AND RESERVOIR UNITS AT SUKAMAJU WTP PDAM TIRTA RAHARJA BANDUNG
by: ILHAM FAUZI, EZWIN