COMPARATIVE ANALYSIS OF CLAY MINING TONNAGE BASED ON SURVEY, WEIGHBRIDGE, AND TRUCK RITASE METHODS AT TLOGOWARU QUARRY, PT SEMEN INDONESIA (PERSERO) TBK TUBAN PLANT

To meet its raw material requirements for cement production, PT Semen Indonesia (Persero) Tbk Tuban Plant collaborates with PT United Tractors Semen Gresik (UTSG) Tuban as a contractor for limestone and clay mining. To accurately assess mining progress, the company employs two existing methods:...

Full description

Saved in:
Bibliographic Details
Main Author: Izzatuddin Muhammad, Haidarsyah
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/78444
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia