VOID FILLING TIME SIMULATION AT PT XYZ
One of the most visible impacts of mining activities is the existence of voids when open-pit mining activities end. The void that is formed will be left to be filled with rainwater, groundwater, and surface water. Based on the mine planning, the void of PT. XYZ can hold approximately 1.366.184.20...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/78459 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |