VOID FILLING TIME SIMULATION AT PT XYZ

One of the most visible impacts of mining activities is the existence of voids when open-pit mining activities end. The void that is formed will be left to be filled with rainwater, groundwater, and surface water. Based on the mine planning, the void of PT. XYZ can hold approximately 1.366.184.20...

Full description

Saved in:
Bibliographic Details
Main Author: Kurniawan, Akbar
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/78459
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items