QUALITY PREDICTION AND SIMULATION OF WATER MANAGEMENT IN THE POST-MINING PHASE AT COPPERGOLD MINE PT XYZ
Mining activities at PT XYZ will conclude in 2033, transitioning into post-mining plans. At the end of operations, remnants of mining will still include mine openings and material piles that could potentially generate acid mine drainage due to leaching from acid-containing rocks. Acid mine draina...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86349 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |