QUALITY PREDICTION AND SIMULATION OF WATER MANAGEMENT IN THE POST-MINING PHASE AT COPPERGOLD MINE PT XYZ

Mining activities at PT XYZ will conclude in 2033, transitioning into post-mining plans. At the end of operations, remnants of mining will still include mine openings and material piles that could potentially generate acid mine drainage due to leaching from acid-containing rocks. Acid mine draina...

Full description

Saved in:
Bibliographic Details
Main Author: Meilia Zahra, Rizka
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/86349
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items