QUALITY PREDICTION AND SIMULATION OF WATER MANAGEMENT IN THE POST-MINING PHASE AT COPPERGOLD MINE PT XYZ
Mining activities at PT XYZ will conclude in 2033, transitioning into post-mining plans. At the end of operations, remnants of mining will still include mine openings and material piles that could potentially generate acid mine drainage due to leaching from acid-containing rocks. Acid mine draina...
Saved in:
Main Author: | Meilia Zahra, Rizka |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/86349 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
MINE DRAINAGE FACILITY PLANNING AT WASTE DUMP COAL MINE OF PT XYZ
by: Ernasari, Meilia -
SIMULATION MODEL FOT POST-MINING PIT LAKE INFILLING AT PT XYZ'S MINING PIT
by: Syahrani, Mega -
PREDICTION OF PIT LAKE WATER QUALITY IN COAL MINING (CASE STUDY IN PIT ABC PT XYZ)
by: RAIN PRATAMA (NIM : 22115021), GINDANG -
SIMULATION OF HOT WATER INJECTION AS AN ALTERNATIVE FOR HANDLING MINE WASTEWATER AT PT XYZ
by: Susanto, Edy -
ANALYSIS OF WATER MANAGEMENT IN A COOPER-GOLD MINE DURING THE POST MINING PHASE WITH BIMODAL RAINFALL DISTRIBUTION
by: Zahy Ghazian Ihsan, Muhamad