EVALUASI BEBAN KERJA MENTAL MAHASISWA PADA PERKULIAHAN MULTIKAMPUS SISTEM BLOK TEKNIK INDUSTRI CIREBON

Since 2010, Institut Teknologi Bandung has officially implement multi-campus system. Industrial Engineering (IE) is one of the study program commit in this sceheme with student’s study activities carried out at Ganesha Campus and Cirebon Campus. Even so, IE at Cirebon Campus is different from Ganesh...

Full description

Saved in:
Bibliographic Details
Main Author: Muslim, Yudisiasita
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/78563
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:78563
spelling id-itb.:785632023-10-25T13:28:56ZEVALUASI BEBAN KERJA MENTAL MAHASISWA PADA PERKULIAHAN MULTIKAMPUS SISTEM BLOK TEKNIK INDUSTRI CIREBON Muslim, Yudisiasita Indonesia Final Project mental workload, block system, NASA-TLX, KSS, stroop test INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/78563 Since 2010, Institut Teknologi Bandung has officially implement multi-campus system. Industrial Engineering (IE) is one of the study program commit in this sceheme with student’s study activities carried out at Ganesha Campus and Cirebon Campus. Even so, IE at Cirebon Campus is different from Ganesha Campus because students follow block and non-blok system lecture mechanisms. The Block system is to combine two or three class meeting of a subject in one day, while the non-blok system is a lecture with class meeting once a week. During the implementation, many students preferred to attend non-blok systems rather than blok system for some reasons such as blok lectures feels to dense, the inability of students to receive a lot of quantitative class material at one time, and the monotonous running of block classes. Therefore, research was conducted to evaluate level of mental workload of IE Cirebon Campus Students in both systems. The results are expected to make the lectures system more effective and efficient. The research was conducted in experiment form involving 38 students from four class year as participants. Experiments were carried out before and after block system and before and after non-blok system class. For each experiment, there are three mental workload measurement tools used, that is NASA-TLX questionnaire, Karolinska Sleepiness Scale (KSS) questionnaire, and stroop test. From these three measuring tools, four parameters are used to measure and evaluate student’s mental workload, that is NASA-TLX final score, KSS score, and total time and total error from stroop test. The evaluation results show that mental workload in block system is higher than non-block system in all measurement parameters. The difference value is the subtraction of the after result with before results in each system. However, the Independent Sample T-Test and Mann Whitney U-Test show that for all parameters, the level of mental workload in block system and non-block system is not significantly different. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Since 2010, Institut Teknologi Bandung has officially implement multi-campus system. Industrial Engineering (IE) is one of the study program commit in this sceheme with student’s study activities carried out at Ganesha Campus and Cirebon Campus. Even so, IE at Cirebon Campus is different from Ganesha Campus because students follow block and non-blok system lecture mechanisms. The Block system is to combine two or three class meeting of a subject in one day, while the non-blok system is a lecture with class meeting once a week. During the implementation, many students preferred to attend non-blok systems rather than blok system for some reasons such as blok lectures feels to dense, the inability of students to receive a lot of quantitative class material at one time, and the monotonous running of block classes. Therefore, research was conducted to evaluate level of mental workload of IE Cirebon Campus Students in both systems. The results are expected to make the lectures system more effective and efficient. The research was conducted in experiment form involving 38 students from four class year as participants. Experiments were carried out before and after block system and before and after non-blok system class. For each experiment, there are three mental workload measurement tools used, that is NASA-TLX questionnaire, Karolinska Sleepiness Scale (KSS) questionnaire, and stroop test. From these three measuring tools, four parameters are used to measure and evaluate student’s mental workload, that is NASA-TLX final score, KSS score, and total time and total error from stroop test. The evaluation results show that mental workload in block system is higher than non-block system in all measurement parameters. The difference value is the subtraction of the after result with before results in each system. However, the Independent Sample T-Test and Mann Whitney U-Test show that for all parameters, the level of mental workload in block system and non-block system is not significantly different.
format Final Project
author Muslim, Yudisiasita
spellingShingle Muslim, Yudisiasita
EVALUASI BEBAN KERJA MENTAL MAHASISWA PADA PERKULIAHAN MULTIKAMPUS SISTEM BLOK TEKNIK INDUSTRI CIREBON
author_facet Muslim, Yudisiasita
author_sort Muslim, Yudisiasita
title EVALUASI BEBAN KERJA MENTAL MAHASISWA PADA PERKULIAHAN MULTIKAMPUS SISTEM BLOK TEKNIK INDUSTRI CIREBON
title_short EVALUASI BEBAN KERJA MENTAL MAHASISWA PADA PERKULIAHAN MULTIKAMPUS SISTEM BLOK TEKNIK INDUSTRI CIREBON
title_full EVALUASI BEBAN KERJA MENTAL MAHASISWA PADA PERKULIAHAN MULTIKAMPUS SISTEM BLOK TEKNIK INDUSTRI CIREBON
title_fullStr EVALUASI BEBAN KERJA MENTAL MAHASISWA PADA PERKULIAHAN MULTIKAMPUS SISTEM BLOK TEKNIK INDUSTRI CIREBON
title_full_unstemmed EVALUASI BEBAN KERJA MENTAL MAHASISWA PADA PERKULIAHAN MULTIKAMPUS SISTEM BLOK TEKNIK INDUSTRI CIREBON
title_sort evaluasi beban kerja mental mahasiswa pada perkuliahan multikampus sistem blok teknik industri cirebon
url https://digilib.itb.ac.id/gdl/view/78563
_version_ 1822281055582814208