STEADY NUMERICAL SIMULATION OF FRANCIS TURBINE OPERATION UNDER LOAD VARIATIONS

The Indonesian government plans to increase New and Renewable Energy (EBT) electricity generation capacity by 35 GW in the 2021-2030 period to accelerate Net Zero Emissions target by 2060. Many EBT power plants are intermittent and hydropower could be an option to maintain power system reliabilit...

Full description

Saved in:
Bibliographic Details
Main Author: Laras Narottomo, Alam
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/79113
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia