STEADY NUMERICAL SIMULATION OF FRANCIS TURBINE OPERATION UNDER LOAD VARIATIONS
The Indonesian government plans to increase New and Renewable Energy (EBT) electricity generation capacity by 35 GW in the 2021-2030 period to accelerate Net Zero Emissions target by 2060. Many EBT power plants are intermittent and hydropower could be an option to maintain power system reliabilit...
Saved in:
Main Author: | Laras Narottomo, Alam |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/79113 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN AND NUMERICAL SIMULATION OF A 1 MW FRANCIS TURBINE FOR THE TEMEF DAM IN EAST NUSA TENGGARA
by: Firdaus, Wildan -
REVERSE ENGINEERING OF 63 MW FRANCIS TURBINE GUIDE VANE GEOMETRY IN PLTA BAKARU
by: Farkhan Rokhmatullah, Muhammad -
EFFECT OF WATER INJECTION DISCHARGE AND NUMBER OF FINS COMBINATION ON PARTIAL LOAD OPERATING CONDITIONS OF HYDRAULIC RUNNER WITH FRANCIS TYPE
by: Febrilian Syah, Muhammad -
THE DESIGN OF 500 KW FRANCIS TURBINE AT 30 M HEAD AND 500 RPM OF ROTATIONAL SPEED
by: Febrianto, Stevanus -
ANALYSIS OF GUIDE VANE GEOMETRY TOWARDS PERFORMANCE OF FRANCIS TURBINE 63 MW ON BAKARU HYDRO POWER PLANT
by: Calvin Gunawan, Agustinus