ANALISA KEPUTUSAN FINANSIAL UNTUK PENGEBORAN SUMUR BARU DI LAPANGAN MERANTI

Infill drilling is a highly common process in the oil and gas field development phase, especially for relatively young fields or those with low oil recovery. Each infill drilling project requires significant investment or capital. Therefore, decision-making regarding field development proposals is...

Full description

Saved in:
Bibliographic Details
Main Author: Miranti, Ratih
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/79136
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:79136
spelling id-itb.:791362023-12-11T09:04:11ZANALISA KEPUTUSAN FINANSIAL UNTUK PENGEBORAN SUMUR BARU DI LAPANGAN MERANTI Miranti, Ratih Manajemen umum Indonesia Theses Infill Drilling, Develop Alternatives, Financial Decision, Value Creation, Analytical Hierarchy Process (AHP) INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/79136 Infill drilling is a highly common process in the oil and gas field development phase, especially for relatively young fields or those with low oil recovery. Each infill drilling project requires significant investment or capital. Therefore, decision-making regarding field development proposals is crucial to achieve the company's profit targets. The company's capital utilization must be directed toward investments that indeed provide the highest value creation. This thesis discusses the opportunity to add new wells in the Meranti Field. The background for proposing this project lies in the potential remaining oil in the Meranti Field and the results from recent drilling in this field. The substantial opportunities identified through subsurface evaluations necessitated the project team to develop various development alternatives to obtain the most economical project package that also meets the criteria set by stakeholders. In addition to quantitative aspects like economic parameters, there are qualitative aspects such as project compliance and project cycle time. To integrate these two quantitative and qualitative aspects, a Decision-Making Analysis was conducted using the Analytical Hierarchy Process (AHP) multidecision criteria method. The results of this financial decision analysis yielded alternatives that meet the economic threshold, provide the highest value creation for investment efficiency, comply with existing regulations, and are visible for execution in the following year. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Miranti, Ratih
ANALISA KEPUTUSAN FINANSIAL UNTUK PENGEBORAN SUMUR BARU DI LAPANGAN MERANTI
description Infill drilling is a highly common process in the oil and gas field development phase, especially for relatively young fields or those with low oil recovery. Each infill drilling project requires significant investment or capital. Therefore, decision-making regarding field development proposals is crucial to achieve the company's profit targets. The company's capital utilization must be directed toward investments that indeed provide the highest value creation. This thesis discusses the opportunity to add new wells in the Meranti Field. The background for proposing this project lies in the potential remaining oil in the Meranti Field and the results from recent drilling in this field. The substantial opportunities identified through subsurface evaluations necessitated the project team to develop various development alternatives to obtain the most economical project package that also meets the criteria set by stakeholders. In addition to quantitative aspects like economic parameters, there are qualitative aspects such as project compliance and project cycle time. To integrate these two quantitative and qualitative aspects, a Decision-Making Analysis was conducted using the Analytical Hierarchy Process (AHP) multidecision criteria method. The results of this financial decision analysis yielded alternatives that meet the economic threshold, provide the highest value creation for investment efficiency, comply with existing regulations, and are visible for execution in the following year.
format Theses
author Miranti, Ratih
author_facet Miranti, Ratih
author_sort Miranti, Ratih
title ANALISA KEPUTUSAN FINANSIAL UNTUK PENGEBORAN SUMUR BARU DI LAPANGAN MERANTI
title_short ANALISA KEPUTUSAN FINANSIAL UNTUK PENGEBORAN SUMUR BARU DI LAPANGAN MERANTI
title_full ANALISA KEPUTUSAN FINANSIAL UNTUK PENGEBORAN SUMUR BARU DI LAPANGAN MERANTI
title_fullStr ANALISA KEPUTUSAN FINANSIAL UNTUK PENGEBORAN SUMUR BARU DI LAPANGAN MERANTI
title_full_unstemmed ANALISA KEPUTUSAN FINANSIAL UNTUK PENGEBORAN SUMUR BARU DI LAPANGAN MERANTI
title_sort analisa keputusan finansial untuk pengeboran sumur baru di lapangan meranti
url https://digilib.itb.ac.id/gdl/view/79136
_version_ 1822996106953359360