IMPROVEMENT OF FLOW SHOP PRODUCTION SCHEDULING TO MINIMIZE MAKESPAN
PT ACP is a company where located in Gunung Putri, Bogor. PT ACP provides cooking or kitchen equipment manufacturing company with main product such as stove, cabinet, and oven products. PT ACP's production type is flow shop type and PT ACP's order fulfillment method is a make-to-order syst...
Saved in:
Main Author: | Chandra Sandjaya Putra, Firza |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/79335 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
by: Liu, S.Q., et al.
Published: (2014) -
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
by: Liu, S.Q., et al.
Published: (2014) -
Mixed-criticality scheduling to minimize makespan
by: Guo, Zhishan, et al.
Published: (2018) -
A scheduling heuristic for simultaneous minimization of makespan and total weighted tardiness in the open shop setup
by: Siy, Eric A.
Published: (1999) -
Minimizing the Makespan for Unrelated Parallel Machines
by: GUO, Yunsong, et al.
Published: (2007)