DESIGN LAYOUT OF DREDGING OF NAVIGATION CHANNEL AND TURNING BASIN IN LEMBAR PORT, WEST NUSA TENGGARA PROVINCE
Lembar Port is one of the ports managed by PT Pelabuhan Indonesia III (Persero) which is located in Lembar District, West Lombok Regency, West Nusa Tenggara Province. This port is designed as a gateway for connectivity to and from Lombok Island in order to support the growth of economic activities a...
Saved in:
Main Author: | Agung Nugraha, Rizky |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/79391 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
LAYOUT DESIGN AND DREDGING PROJECT FOR APPROACH CHANNEL AND TURNING BASIN AT PATIMBAN PORT STAGE 1 PHASE 1
by: Jatmika Zamzam Rifai, Rizki -
LAYOUT DESIGN AND DREDGING PROJECT OF NAVIGATION CHANNEL AND TUNING BASIN AT DRY BULK TERMINAL IN THE C PIER OF DUMAI PORT
by: E M Sirait, Maria -
LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND BASIN IN PELABUHAN RATU STEAM POWER PLANT WEST JAVA PROVINCE
by: Gunawan Gomasjaya, Vincent -
LAYOUT DESIGN AND DREDGING WORK OF NAVIGATION CHANNEL AND HARBOUR BASIN IN THE LEWOLEBA PORT, NUSA TENGGARA TIMUR
by: Arsyad, Fiqry -
LAYOUT DESIGN AND DREDGING WORKS FOR NAVIGATION CHANNEL AND TURNING BASIN OF KENDARI NEW PORT
by: Ramadhani, Rania