PROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA)

PT Lintas Mediatama (PT LIMA) is a company which operates in the advertising industry. PT LIMA was chosen by PT S as the contractor responsible for the procurement and installation of LED Media Wall Façade & Panoramic Elevator Mall. Unfortunately, the project was delayed in completion from the p...

Full description

Saved in:
Bibliographic Details
Main Author: Farah Adzhani, Ethandra
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/79537
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:79537
spelling id-itb.:795372024-01-09T13:37:23ZPROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA) Farah Adzhani, Ethandra Manajemen umum Indonesia Theses Project delay, current reality tree, project management INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/79537 PT Lintas Mediatama (PT LIMA) is a company which operates in the advertising industry. PT LIMA was chosen by PT S as the contractor responsible for the procurement and installation of LED Media Wall Façade & Panoramic Elevator Mall. Unfortunately, the project was delayed in completion from the predetermined time. This thesis aims to find the root of the problem and find solutions and lessons learned that can be used by the company in reducing the root of the problem and preventing and minimizing delays that may occur in future projects. The method used in this research is a qualitative method by conducting interviews with parties directly involved with the project. The Current Reality Tree is the method used in finding the root of the problem in this project. The root causes of this project delay are lack of stakeholder management because of not identifying and engaging stakeholders regularly, lack of communication management because of miscommunication due to lack of communication and ineffective coordinations due to lack of monitoring communications, lack of resources management because of lack of competence and experience in documentation (progress report). To address the root causes, this study proposes to implement project management contained in PMBOK 6th edition. The proposed business solutions are reviewing the stakeholder community and engagement regularly, making a stakeholder engagement plan and followed by reviewed and updated regularly, communicating and monitoring regularly with the new stakeholder using appropriate communication channels such as onsite and online meetings, setting expectations early on managing new stakeholders, create a communication management plan and be reviewed regularly and modified if necessary, implement and routinely monitoring communications to make sure the coordinations between stakeholders is implemented effectively, provide training to appropriate team members regarding documentation, and conduct documentation regarding knowledge sharing information. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Farah Adzhani, Ethandra
PROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA)
description PT Lintas Mediatama (PT LIMA) is a company which operates in the advertising industry. PT LIMA was chosen by PT S as the contractor responsible for the procurement and installation of LED Media Wall Façade & Panoramic Elevator Mall. Unfortunately, the project was delayed in completion from the predetermined time. This thesis aims to find the root of the problem and find solutions and lessons learned that can be used by the company in reducing the root of the problem and preventing and minimizing delays that may occur in future projects. The method used in this research is a qualitative method by conducting interviews with parties directly involved with the project. The Current Reality Tree is the method used in finding the root of the problem in this project. The root causes of this project delay are lack of stakeholder management because of not identifying and engaging stakeholders regularly, lack of communication management because of miscommunication due to lack of communication and ineffective coordinations due to lack of monitoring communications, lack of resources management because of lack of competence and experience in documentation (progress report). To address the root causes, this study proposes to implement project management contained in PMBOK 6th edition. The proposed business solutions are reviewing the stakeholder community and engagement regularly, making a stakeholder engagement plan and followed by reviewed and updated regularly, communicating and monitoring regularly with the new stakeholder using appropriate communication channels such as onsite and online meetings, setting expectations early on managing new stakeholders, create a communication management plan and be reviewed regularly and modified if necessary, implement and routinely monitoring communications to make sure the coordinations between stakeholders is implemented effectively, provide training to appropriate team members regarding documentation, and conduct documentation regarding knowledge sharing information.
format Theses
author Farah Adzhani, Ethandra
author_facet Farah Adzhani, Ethandra
author_sort Farah Adzhani, Ethandra
title PROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA)
title_short PROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA)
title_full PROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA)
title_fullStr PROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA)
title_full_unstemmed PROJECT DELAY ANALYSIS IN PT LINTAS MEDIATAMA (PT LIMA)
title_sort project delay analysis in pt lintas mediatama (pt lima)
url https://digilib.itb.ac.id/gdl/view/79537
_version_ 1822996330714234880