THE BEST PROJECT FUNDING SCHEME SOLUTION TO STABILIZE CASH FLOW USING VALUE-FOCUSED THINKING AND ANALYTIC HIERARCHY PROCESS
PT Rekadaya Elektrika is a subsidiary of PT PLN Nusantara Power engaged in Engineering, Procurement, and Construction (EPC) in the power sector. In early 2023, PT Rekadaya Elektrika signed a contract for the procurement, construction, testing, and commissioning of the Bali LNG Terminal with a short...
Saved in:
Main Author: | Susilawati, Endang |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/79676 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
VALUE-FOCUSED THINKING AND ANALYTICAL HIERARCHY PROCESS METHOD TO SELECTING THE BEST HEAD TRUCK AT ELNUSA PETROFIN TRANSPORTATION DEPARTMENT AREA V KALIMANTAN
by: Saputra, Deri -
VALUE-FOCUSED THINKING AND ANALYTIC HIERARCHY PROCESS APPROACH TO SELECTING THE BEST OPTION IN DECISION MAKING AT PLN UIP JBB: A CASE STUDY IN THE CAWANG-GANDUL PROJECT
by: Sutami Winowoda, Benaya -
THE IMPLEMENTATION OF ANALYTICAL HIERARCHY PROCESS TO CHOOSE THE BEST SOLUTION TO INCREASE MOULD MAKER PROFIT
by: Erick, Simon -
IMPROVING OIL PRODUCTION USING COMBINATION OF KEPNER-TREGOE, VALUE-FOCUSED THINKING AND ANALYTIC HIERARCHY PROCESS
by: M.T. Malau, Leonard -
DECISION ANALYSIS OF ANH GAS FIELD DEVELOPMENT BY USING VALUE FOCUSED THINKING & ANALYTIC HIERARCHY PROCESS
by: S P Manurung, Adolf