#TITLE_ALTERNATIVE#

ABSTRACT: <br /> <br /> <br /> Disputes in Construction Industry often caused in delay, cost overrun, inefficiency and conflict between the contractual parties. The disputants naturally may seek the settlement of dispute through the least complex, cheap and amicable settlement. &l...

Full description

Saved in:
Bibliographic Details
Main Author: Sozuaon P. Simbolon (NIM 25097015), Guru
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/7991
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:7991
spelling id-itb.:79912017-09-27T15:23:30Z#TITLE_ALTERNATIVE# Sozuaon P. Simbolon (NIM 25097015), Guru Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/7991 ABSTRACT: <br /> <br /> <br /> Disputes in Construction Industry often caused in delay, cost overrun, inefficiency and conflict between the contractual parties. The disputants naturally may seek the settlement of dispute through the least complex, cheap and amicable settlement. <br /> <br /> <br /> This research aims to develop a framework of mediation rules which is expectedly to be used as a guidance procedure in the mediation practise in Indonesian Construction Industry. Basically, the framework was developed based on HKIE (1989) Mediation Service Rules and AAA (1994) Construction Industry Mediation Rules and referred to Indonesian Arbitration Board (1985) Procedure Rules and Indonesian Republic Laws no. 30 about Arbitration and Alternatives Dispute Resolution. Besides it was based on the social culture, consensus in reconcile the dispute. geography, and many inputs and opinions from the Indonesian Construction Indust' stakeholders, such as owner. consultant. contractor, mediator and arbitrator <br /> <br /> <br /> The result of this research is a framework of mediation rules which cover 15 main rules. They arc Definition of Mediation: Agreement of Parties; Initiation and Request for Mediation; Responsibility and Commitment from Each Party to Solve the Dispute; Authority of Representatives from Each Disputant; Interpretation and Application of Mediation Procedures; Privacy, Confidentiality, and Comfort in Mediation Process; Date, Time and Place of Mediation Process is Performed; Termination of Mediation Process; Fees and Expenses; Authority. Qualification and Exclusion of Mediator; Identification of Matters in Dispute; Trustworthiness of Each Disputant to Their Own Counselor; Execution of Decision; and Others. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description ABSTRACT: <br /> <br /> <br /> Disputes in Construction Industry often caused in delay, cost overrun, inefficiency and conflict between the contractual parties. The disputants naturally may seek the settlement of dispute through the least complex, cheap and amicable settlement. <br /> <br /> <br /> This research aims to develop a framework of mediation rules which is expectedly to be used as a guidance procedure in the mediation practise in Indonesian Construction Industry. Basically, the framework was developed based on HKIE (1989) Mediation Service Rules and AAA (1994) Construction Industry Mediation Rules and referred to Indonesian Arbitration Board (1985) Procedure Rules and Indonesian Republic Laws no. 30 about Arbitration and Alternatives Dispute Resolution. Besides it was based on the social culture, consensus in reconcile the dispute. geography, and many inputs and opinions from the Indonesian Construction Indust' stakeholders, such as owner. consultant. contractor, mediator and arbitrator <br /> <br /> <br /> The result of this research is a framework of mediation rules which cover 15 main rules. They arc Definition of Mediation: Agreement of Parties; Initiation and Request for Mediation; Responsibility and Commitment from Each Party to Solve the Dispute; Authority of Representatives from Each Disputant; Interpretation and Application of Mediation Procedures; Privacy, Confidentiality, and Comfort in Mediation Process; Date, Time and Place of Mediation Process is Performed; Termination of Mediation Process; Fees and Expenses; Authority. Qualification and Exclusion of Mediator; Identification of Matters in Dispute; Trustworthiness of Each Disputant to Their Own Counselor; Execution of Decision; and Others.
format Theses
author Sozuaon P. Simbolon (NIM 25097015), Guru
spellingShingle Sozuaon P. Simbolon (NIM 25097015), Guru
#TITLE_ALTERNATIVE#
author_facet Sozuaon P. Simbolon (NIM 25097015), Guru
author_sort Sozuaon P. Simbolon (NIM 25097015), Guru
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/7991
_version_ 1820664298593058816