PERANCANGAN METODE PENJADWALAN PADA AREA MOLD PRESS VULCANIZING UNTUK MEMINIMALKAN TARDINESS
The research object company under research is a manufacturing company engaged in the natural rubber industry located in Bandung City, West Java. Based on the flow of the production process, there is one department location that applies the flexible Job shop concept with the Make to Order (MTO) ma...
Saved in:
Main Author: | Wafiq Azizah, Isna |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/79943 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENJADWALAN PEKERJAAN YANG BERGANTUNG PADA DENDA JOB EARLINESS DAN TARDINESS UNTUK MESIN TUNGGAL
by: HERLINA SIMARMATA, 089811798
Published: (2003) -
PENJADWALAN PEKERJAAN YANG BERGANTUNG
PADA DENDA JOB EARLINESS DAN TARDINESS
UNTUK MESlN TUNGGAL
by: HERLINA SIMARMATA, 089811798
Published: (2003) -
PERANCANGAN CACHE MEMORY MELALUI PENENTUAN UKURAN BLOK UNTUK MEMINIMALKAN MISS RATE
by: Heri Setya Budi, Agus -
PERANCANGAN CACHE MEMORY MELALUI PENENTUAN UKURAN BLOK UNTUK MEMINIMALKAN MISS RATE
by: Heri Setya Budi, Agus -
Perancangan sistem informasi penjadwalan perjalanan kereta api
by: , TRIANTONO, Ferdian Danu, et al.
Published: (2010)