ANALISIS RISIKO PROYEK PEMBANGUNAN GEDUNG PEMERINTAHAN DENGAN METODE SIMULASI MONTE CARLO
As an industrial engineer, the biggest constraints in construction project are in project management science, which takes a big part in managing two of the three important project constraints, namely time and cost. PT Haka Utama is currently in the project planning stage for the construction of a...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/79948 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |