ANALISIS RISIKO PROYEK PEMBANGUNAN GEDUNG PEMERINTAHAN DENGAN METODE SIMULASI MONTE CARLO
As an industrial engineer, the biggest constraints in construction project are in project management science, which takes a big part in managing two of the three important project constraints, namely time and cost. PT Haka Utama is currently in the project planning stage for the construction of a...
Saved in:
Main Author: | Theophila Hadinata, Thalia |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/79948 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALISIS RISIKO PADA PROYEK PENYELESAIAN GEDUNG APARTEMEN DENGAN METODE SIMULASI MONTE CARLO
by: Pradipta Riyadi, Rifky -
PENILAIAN GEDUNG DENGAN PENDEKATAN PENDAPATAN MENGGUNAKAN SIMULASI MONTE CARLO: Studi Kasus: Gedung Thamrin, Jakarta
by: , HASRUL NASUTION, S.T., et al.
Published: (2014) -
EVALUASI KELAYAKAN FINANSIAL PROYEK DENGAN METODE NPV AT RISK BERDASARKAN SIMULASI MONTE CARLO (STUDI KASUS: PROYEK X DI PT ABC)
by: Holifah -
PENGUKURAN RISIKO ASET TUNGGAL DAN PORTOFOLIO SAHAM LQ45 DENGAN VALUE AT RISK METODE SIMULASI MONTE CARLO
by: , Billy Martha Hardiwansyah, SE, et al.
Published: (2012) -
ANALISIS RESIKO MENGGUNAKAN METODE SIMULASI MONTE CARLO UNTUK MENILAI KELAYAKAN INVESTASI HOTEL X
by: , I Komang Adiguna, et al.
Published: (2011)