#TITLE_ALTERNATIVE#
Abstract: <br /> <br /> <br /> There are common methods which are oftenly used for the project planning and scheduling, such as Critical Path Method (CPM) and Program Evaluation Review Technique and (PERT). Both, seen from the perspective of flow management, information input/outp...
Saved in:
Main Author: | Afryandi (NIM 234 03 023), Harry |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8033 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 234 99 023), Gunardi -
#TITLE_ALTERNATIVE#
by: Riani Ningrum (NIM 135 03 023), Miridhani -
#TITLE_ALTERNATIVE#
by: Amru Reza (nim: 101 03 023), Mohamad -
#TITLE_ALTERNATIVE#
by: Puspa Indah (NIM 107 03 023) , Marvida -
#TITLE_ALTERNATIVE#
by: Zulkifli Hartono (NIM 152 03 023), Amirullah