CONTRACT CHANGE ORDERS HANDLING OF DESIGN-BID-BUILD PROJECTS WITH FINANCING FOREIGN LOAN.
Saved in:
Main Author: | Islahiyah, Madaliatul |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80496 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Predicting performance of design-build and design-bid-build projects
by: Ling, F.Y.Y., et al.
Published: (2013) -
Comparing the performance of design-build and design-bid-build building projects in Singapore
by: Ling, F.Y.Y., et al.
Published: (2013) -
Key determinants of performance of design-bid-build projects in Singapore
by: Ling, F.Y.Y.
Published: (2013) -
ANALYSIS OF CAUSES, IMPACTS, AND HOW TO MITIGATE CONTRACT CHANGE ORDER IN THE THAMRIN NINE PHASE II BUILDING PROJECT
by: Alfatah Abiyu Otslan, Giffary -
CONTRACTOR PROJECT MANAGEMENT IN DESIGN AND BUILD CONTRACT
by: STEVEN SOO MIN SING
Published: (2018)