DESIGN OF BAGENDUNG MATERIAL RECOVERY FACILITY (MRF) IN CILEGON CITY
Cilegon City faces significant challenges in waste management, requiring better infrastructure to maximize waste processing and reduce negative environmental impacts. This study involved data collection on waste quantity and composition, selection of alternative waste processing and sorting technol...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/80865 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:80865 |
---|---|
spelling |
id-itb.:808652024-03-14T13:38:31ZDESIGN OF BAGENDUNG MATERIAL RECOVERY FACILITY (MRF) IN CILEGON CITY Azzahra Priputri, Tasyafa Indonesia Final Project Waste Management, Integrated Waste Management Facility, Simple Additive Weighting Method, Refuse Derived Fuel, Bio Drying, Economic Analysis. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/80865 Cilegon City faces significant challenges in waste management, requiring better infrastructure to maximize waste processing and reduce negative environmental impacts. This study involved data collection on waste quantity and composition, selection of alternative waste processing and sorting technologies using the Simple Additive Weighting (SAW) method. Construction and operational cost requirements were also calculated, and economic analysis results were conducted. Based on the 2038 projections, the MRF's design capacity was set at 400 tons per day. The selected processing system alternative is the conversion of mixed waste into Refuse Derived Fuel (RDF) and sorting recyclable waste, utilizing semi-manual sorting technology and drying through the bio drying method. The initial capital cost of the MRF is Rp40,786,680,000.00, with an operational cost reaching Rp9,203,379 per year. Economic analysis results indicate that the project is viable and sustainable. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Cilegon City faces significant challenges in waste management, requiring better infrastructure to maximize waste processing and reduce negative environmental impacts.
This study involved data collection on waste quantity and composition, selection of alternative waste processing and sorting technologies using the Simple Additive Weighting (SAW) method. Construction and operational cost requirements were also calculated, and economic analysis results were conducted.
Based on the 2038 projections, the MRF's design capacity was set at 400 tons per day. The selected processing system alternative is the conversion of mixed waste into Refuse Derived Fuel (RDF) and sorting recyclable waste, utilizing semi-manual sorting technology and drying through the bio drying method. The initial capital cost of the MRF is Rp40,786,680,000.00, with an operational cost reaching Rp9,203,379 per year. Economic analysis results indicate that the project is viable and sustainable.
|
format |
Final Project |
author |
Azzahra Priputri, Tasyafa |
spellingShingle |
Azzahra Priputri, Tasyafa DESIGN OF BAGENDUNG MATERIAL RECOVERY FACILITY (MRF) IN CILEGON CITY |
author_facet |
Azzahra Priputri, Tasyafa |
author_sort |
Azzahra Priputri, Tasyafa |
title |
DESIGN OF BAGENDUNG MATERIAL RECOVERY FACILITY (MRF) IN CILEGON CITY |
title_short |
DESIGN OF BAGENDUNG MATERIAL RECOVERY FACILITY (MRF) IN CILEGON CITY |
title_full |
DESIGN OF BAGENDUNG MATERIAL RECOVERY FACILITY (MRF) IN CILEGON CITY |
title_fullStr |
DESIGN OF BAGENDUNG MATERIAL RECOVERY FACILITY (MRF) IN CILEGON CITY |
title_full_unstemmed |
DESIGN OF BAGENDUNG MATERIAL RECOVERY FACILITY (MRF) IN CILEGON CITY |
title_sort |
design of bagendung material recovery facility (mrf) in cilegon city |
url |
https://digilib.itb.ac.id/gdl/view/80865 |
_version_ |
1822281745956864000 |