#TITLE_ALTERNATIVE#
Abstract: <br /> <br /> <br /> <br /> <br /> The development of electric energy demand in Indonesia in the early 1980 brought to PLN dealt with coal fired power plant. This development poses the problem of disposing and utilizing the fly ash, nowadays it is becomin...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/8095 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |