CONSTRUCTION MANAGEMENT AND ENGINEERING: DESIGN OF CREATIVE CENTER IN BINTARO JAYA, SOUTH TANGERANG
Construction of Creative Center in Bintaro Jaya, South Tangerang, as the Central Government’s commitment to developing the national creative economy, aims to promote appreciationn to arts itself. This final project has the objective of designing the management aspect of the project that complies...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81114 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Construction of Creative Center in Bintaro Jaya, South Tangerang, as the
Central Government’s commitment to developing the national creative economy,
aims to promote appreciationn to arts itself. This final project has the objective of
designing the management aspect of the project that complies with local standards
regarding costs, duration, quality, and health. Scope of works analyzed include
preparation work, earthwork, lower structure work, upper structure work, as well
as pavement and parking facilities work.
Creative Center in Bintaro Jaya, consisting of two basement floors and 4
upper floors with the height of 4,2 meters for each floor, is constructed using
bottom-up method. Equipments productivity analysis, production rate, as well as
workers’ productivity, along with quantity take-off results, are used to esimate the
construction cost and to design its scheduling. The construction of Creative Center
commences on January 1, 2024, with a direct-cost of Rp103.775.235.730,30 and
an indirect-cost of Rp10.704.895.807,64, and finishes on April 23, 2025 (478 days). |
---|