IDENTIFICATION AND STUDY OF CRITICAL RISKS ON CONSTRUCTION PHASE OF UNDERGROUND RAIL INFRASTRUCTURE DEVELOPMENT PROJECT IN INDONESIA (CASE STUDY: PT. X RAIL PROJECT).
PT.X Phase 2 train infrastructure project is a national strategic project. This is one solution to overcome the extraordinary problem of traffic congestion in the capital city. Phase 2 construction began in 2020 with estimated project completion in 2029 for Phase 2A. The progress at the construct...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/81122 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!