IDENTIFICATION AND STUDY OF CRITICAL RISKS ON CONSTRUCTION PHASE OF UNDERGROUND RAIL INFRASTRUCTURE DEVELOPMENT PROJECT IN INDONESIA (CASE STUDY: PT. X RAIL PROJECT).

PT.X Phase 2 train infrastructure project is a national strategic project. This is one solution to overcome the extraordinary problem of traffic congestion in the capital city. Phase 2 construction began in 2020 with estimated project completion in 2029 for Phase 2A. The progress at the construct...

Full description

Saved in:
Bibliographic Details
Main Author: Rahayu Purwanti, Dwi
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/81122
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items