IDENTIFICATION AND STUDY OF CRITICAL RISKS ON CONSTRUCTION PHASE OF UNDERGROUND RAIL INFRASTRUCTURE DEVELOPMENT PROJECT IN INDONESIA (CASE STUDY: PT. X RAIL PROJECT).
PT.X Phase 2 train infrastructure project is a national strategic project. This is one solution to overcome the extraordinary problem of traffic congestion in the capital city. Phase 2 construction began in 2020 with estimated project completion in 2029 for Phase 2A. The progress at the construct...
Saved in:
Main Author: | Rahayu Purwanti, Dwi |
---|---|
Format: | Theses |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/81122 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
RELATIONSHIP BETWEEN IMPLEMENTATION VERSUS BARRRIER OF ISO 14001 ON CONSTRUCTION FIRMS CASE STUDY FOR FACTORY, BUILDING & INFRASTRUCTURE PROJECT
by: Dwi Nugroho, Agung -
CONSTRUCTION PROJECT WASTE IDENTIFICATION: CASE STUDY ON A BUILDING CONTRACTOR
by: Made Bayu Purnama, I -
STUDY OF PERFORMANCE AND EFFECTIVENESS OF LEAD RUBBER BEARING USE ON MUSI LIGHT RAIL TRANSIT BRIDGE
by: KURNIAWAN, ALVIN -
STUDY THE IMPLEMENTATION OF SUSTAINABLE CONSTRUCTION IN BUILDING PROJECT
by: AULIA MUTIANISA, MIFNA -
IDENTIFICATION OF INFLUENCING FACTORS ON THE UTILIZATION OF SURAT BERHARGA SYARIAH NEGARA (SBSN) AS AN ALTERNATIVE FINANCING SOURCE FOR INFRASTRUCTURE PROJECTS IN INDONESIA
by: Akmal, Bariq