IMPLEMENTATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT METHODS IN THE POWER PLANT USING EVENT STATUS, EQUIPMENT CAUSE CODE, AND FAILURE MODE IN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION (NERC) STANDARD

The electricity production at the PT PLN (Persero) power plant will provide optimal results if it is supported by adequate and measured plant performance monitoring and evaluation. Some of the methods currently used, namely the North American Electric Reliability Corporation (NERC) Performance an...

Full description

Saved in:
Bibliographic Details
Main Author: Badrazamani, Dani
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/81164
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:81164
spelling id-itb.:811642024-05-07T09:20:44ZIMPLEMENTATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT METHODS IN THE POWER PLANT USING EVENT STATUS, EQUIPMENT CAUSE CODE, AND FAILURE MODE IN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION (NERC) STANDARD Badrazamani, Dani Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Theses performance monitoring and evaluation, power plant, Overall Equipment Effectiveness (OEE), NERC Performance. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/81164 The electricity production at the PT PLN (Persero) power plant will provide optimal results if it is supported by adequate and measured plant performance monitoring and evaluation. Some of the methods currently used, namely the North American Electric Reliability Corporation (NERC) Performance and Overall Equipment Effectiveness (OEE) are still not optimal because the implementation is still carried out separately and although there is already a PLN Board of Directors Regulation in 2013 concerning OEE Power Plant, apparently found many differences implementation in the PLN Group (PLN Sumatra Region, PT Pembangkit Jawa Bali, and PT Indonesia Power). By using NERC event status standards as OEE Power Plant’s loss output, we will get The Six Big Loses Loses in more detail so that they will be able to provide better recommendations for improvement. This integration also makes it possible to directly obtain NERC Performance values. Thus it can reduce the occurrence of rework, reduce the potential for data input errors, and ensure of data integrity. Therefore the focus of this research is to design the OEE Power Plant using the Event Status, Equipment Cause Code, and Failure Mode NERC standard. By using operational data of Tarahan #03 Coal Fired Steam Power Plant in 2018, the application result showed the value of OEE = 52.97%, TEEP = 40.88% with its Pareto Loss Output (PLO), Equivalent Availability Factor (EAF) without OMC = 53.46%, Equivalent Availability Factor (EAF) with OMC = 54.43%, Equivalent Forced Outage Rate (EFOR) without OMC = 24.26%, Equivalent Forced Outage Rate (EFOR) with OMC = 23.06%, Scheduled Outage Factor (SOF) = 28.55%, and Gross Capacity Factor (CF) = 47.30%. This result compared with the existing OEE method in the PLN Group and is also used to get the relationship between OEE and NERC Performance. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Badrazamani, Dani
IMPLEMENTATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT METHODS IN THE POWER PLANT USING EVENT STATUS, EQUIPMENT CAUSE CODE, AND FAILURE MODE IN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION (NERC) STANDARD
description The electricity production at the PT PLN (Persero) power plant will provide optimal results if it is supported by adequate and measured plant performance monitoring and evaluation. Some of the methods currently used, namely the North American Electric Reliability Corporation (NERC) Performance and Overall Equipment Effectiveness (OEE) are still not optimal because the implementation is still carried out separately and although there is already a PLN Board of Directors Regulation in 2013 concerning OEE Power Plant, apparently found many differences implementation in the PLN Group (PLN Sumatra Region, PT Pembangkit Jawa Bali, and PT Indonesia Power). By using NERC event status standards as OEE Power Plant’s loss output, we will get The Six Big Loses Loses in more detail so that they will be able to provide better recommendations for improvement. This integration also makes it possible to directly obtain NERC Performance values. Thus it can reduce the occurrence of rework, reduce the potential for data input errors, and ensure of data integrity. Therefore the focus of this research is to design the OEE Power Plant using the Event Status, Equipment Cause Code, and Failure Mode NERC standard. By using operational data of Tarahan #03 Coal Fired Steam Power Plant in 2018, the application result showed the value of OEE = 52.97%, TEEP = 40.88% with its Pareto Loss Output (PLO), Equivalent Availability Factor (EAF) without OMC = 53.46%, Equivalent Availability Factor (EAF) with OMC = 54.43%, Equivalent Forced Outage Rate (EFOR) without OMC = 24.26%, Equivalent Forced Outage Rate (EFOR) with OMC = 23.06%, Scheduled Outage Factor (SOF) = 28.55%, and Gross Capacity Factor (CF) = 47.30%. This result compared with the existing OEE method in the PLN Group and is also used to get the relationship between OEE and NERC Performance.
format Theses
author Badrazamani, Dani
author_facet Badrazamani, Dani
author_sort Badrazamani, Dani
title IMPLEMENTATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT METHODS IN THE POWER PLANT USING EVENT STATUS, EQUIPMENT CAUSE CODE, AND FAILURE MODE IN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION (NERC) STANDARD
title_short IMPLEMENTATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT METHODS IN THE POWER PLANT USING EVENT STATUS, EQUIPMENT CAUSE CODE, AND FAILURE MODE IN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION (NERC) STANDARD
title_full IMPLEMENTATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT METHODS IN THE POWER PLANT USING EVENT STATUS, EQUIPMENT CAUSE CODE, AND FAILURE MODE IN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION (NERC) STANDARD
title_fullStr IMPLEMENTATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT METHODS IN THE POWER PLANT USING EVENT STATUS, EQUIPMENT CAUSE CODE, AND FAILURE MODE IN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION (NERC) STANDARD
title_full_unstemmed IMPLEMENTATION OF OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT METHODS IN THE POWER PLANT USING EVENT STATUS, EQUIPMENT CAUSE CODE, AND FAILURE MODE IN NORTH AMERICAN ELECTRIC RELIABILITY CORPORATION (NERC) STANDARD
title_sort implementation of overall equipment effectiveness (oee) measurement methods in the power plant using event status, equipment cause code, and failure mode in north american electric reliability corporation (nerc) standard
url https://digilib.itb.ac.id/gdl/view/81164
_version_ 1822009399957258240