OPTIMAL MACHINE SCHEDULING PROBLEM WITH REGULAR CHANGEOVER PERIOD
This research delves into the main challenges in the manufacturing industry, focusing on the Packing Line stage, where production scheduling is key to achieving the company's output target On Time In Full (OTIF) while minimizing production costs. By utilizing a mathematical approach through opt...
Saved in:
Main Author: | Sophie Basar Tobing, Olivia |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81547 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Novel genetic algorithm for short-term scheduling of sequence dependent changeovers in multiproduct polymer plants
by: Ramteke, M., et al.
Published: (2014) -
OPTIMIZING PRODUCTION SCHEDULE BASED ON OVERALL EQUIPMENT EFFECTIVENESS USING GENETIC ALGORITHM TO REDUCE CHANGEOVER (Case Study: at PT MIYU JAYA PERKASA)
by: Natasha Nindya Putri, Valeria -
Behaviour of motorists during changeover of the electronic road pricing system
by: Goh, Qi Huat
Published: (2014) -
Behaviour of motorists during changeover of rates of the electronic road pricing system
by: Tan, Kelvin Yik Keong
Published: (2014) -
A device for augmented feedback during the practice of relay changeovers in swimming
by: Ho, Chong Jian
Published: (2023)