CONTINUOUS GIRDER BRIDGE STRUCTURAL DESIGN MANADO-BITUNG TOLL ROAD
In the construction of the Manado-Bitung Toll Road, there is an obstacle in the form of a valley approximately 55 meters deep from the planned elevation. Therefore, a bridge is needed to connect the ravine. In this final design assignment, the author will design a bridge at this location. Based o...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/81574 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Institut Teknologi Bandung |
語言: | Indonesia |