CONTINUOUS GIRDER BRIDGE STRUCTURAL DESIGN MANADO-BITUNG TOLL ROAD
In the construction of the Manado-Bitung Toll Road, there is an obstacle in the form of a valley approximately 55 meters deep from the planned elevation. Therefore, a bridge is needed to connect the ravine. In this final design assignment, the author will design a bridge at this location. Based o...
Saved in:
Main Author: | Siswaji, Vincent |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/81574 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF PCI GIRDER BRIDGE STRUCTURE WITH PORTAL PIERS (AEK LATONG ROAD RELOCATION STUDY CASE)
by: Gayendra Putra, Fattarazza -
OPTIMIZATION OF PRECAST GIRDER PROCUREMENT FOR THE TOLL ROAD DEVELOPMENT PROJECT OF SEMARANG â DEMAK 1A
by: Dibyana Prakasita, Fasya -
ROAD SAFETY INVESTIGATION IN CIPULARANG TOLL ROAD
by: Nabila, Syahla -
DESIGN OF THE PRESTRESSED BOX GIRDER BRIDGE STRUCURE FOR A SECTION OF THE JAKARTA-BANDUNG HIGH-SPEED TRAIN STATION
by: Fajar Ichsan, Muhammad -
PRESTRESSED CONCRETE I-GIRDER BRIDGE DESIGN FOR TERMINAL PETIKEMAS SURABAYA ̉̉ KALIMAS RAILWAY
by: AKHYAR FAISAL, FADLAN