RELIABILITY IMPROVEMENT PROCESS CASE STUDY: PT SHM TBK.

Maintaining efficient and reliable production processes is crucial in the everchanging tobacco industry. This research focuses on understanding the impact of unplanned and planned downtimes on Process Reliability (PR) performance, identifying the root causes of low PR, and proposing strategies to im...

Full description

Saved in:
Bibliographic Details
Main Author: Putri, Sylvania
Format: Theses
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/81652
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:81652
spelling id-itb.:816522024-07-02T14:24:49ZRELIABILITY IMPROVEMENT PROCESS CASE STUDY: PT SHM TBK. Putri, Sylvania Manajemen umum Indonesia Theses Current Reality Tree, Analytical Hierarchy Process, Performance Improvement. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/81652 Maintaining efficient and reliable production processes is crucial in the everchanging tobacco industry. This research focuses on understanding the impact of unplanned and planned downtimes on Process Reliability (PR) performance, identifying the root causes of low PR, and proposing strategies to improve it. The study acknowledges the significant challenges faced by the company, mainly due to the COVID-19 pandemic. We understand that this has led to decreased demand, supply chain disruptions, and changes in consumer behavior. A mixedmethod approach combines quantitative data from seven production lines over the first quarter of 2024 with qualitative insights from interviews with key personnel. A root cause analysis using the Current Reality Tree (CRT) method reveals that focusing maintenance strategies only on critical parts and introducing new materials without thorough testing are significant factors contributing to low PR. The Analytical Hierarchy Process (AHP) evaluates and prioritizes six alternative solutions based on implementation cost, feasibility, and implementation time. Key recommendations include developing a comprehensive maintenance plan that covers all machine parts and thoroughly testing and validating new materials before full-scale implementation. With these strategies in place, we can look forward to enhanced PR performance, reduced downtimes, and improved operational efficiency. The recommendations inspire confidence in our ability to overcome the current challenges. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Manajemen umum
spellingShingle Manajemen umum
Putri, Sylvania
RELIABILITY IMPROVEMENT PROCESS CASE STUDY: PT SHM TBK.
description Maintaining efficient and reliable production processes is crucial in the everchanging tobacco industry. This research focuses on understanding the impact of unplanned and planned downtimes on Process Reliability (PR) performance, identifying the root causes of low PR, and proposing strategies to improve it. The study acknowledges the significant challenges faced by the company, mainly due to the COVID-19 pandemic. We understand that this has led to decreased demand, supply chain disruptions, and changes in consumer behavior. A mixedmethod approach combines quantitative data from seven production lines over the first quarter of 2024 with qualitative insights from interviews with key personnel. A root cause analysis using the Current Reality Tree (CRT) method reveals that focusing maintenance strategies only on critical parts and introducing new materials without thorough testing are significant factors contributing to low PR. The Analytical Hierarchy Process (AHP) evaluates and prioritizes six alternative solutions based on implementation cost, feasibility, and implementation time. Key recommendations include developing a comprehensive maintenance plan that covers all machine parts and thoroughly testing and validating new materials before full-scale implementation. With these strategies in place, we can look forward to enhanced PR performance, reduced downtimes, and improved operational efficiency. The recommendations inspire confidence in our ability to overcome the current challenges.
format Theses
author Putri, Sylvania
author_facet Putri, Sylvania
author_sort Putri, Sylvania
title RELIABILITY IMPROVEMENT PROCESS CASE STUDY: PT SHM TBK.
title_short RELIABILITY IMPROVEMENT PROCESS CASE STUDY: PT SHM TBK.
title_full RELIABILITY IMPROVEMENT PROCESS CASE STUDY: PT SHM TBK.
title_fullStr RELIABILITY IMPROVEMENT PROCESS CASE STUDY: PT SHM TBK.
title_full_unstemmed RELIABILITY IMPROVEMENT PROCESS CASE STUDY: PT SHM TBK.
title_sort reliability improvement process case study: pt shm tbk.
url https://digilib.itb.ac.id/gdl/view/81652
_version_ 1822009546168598528