MAPPING OF THE LUMUT BALAI GEOTHERMAL POWER PLANT (GPP)
The Geothermal Power Plant (PLTP) owned by PT X PLTP was built with less than ideal topographic and geological conditions, namely by clearing mountainous land This makes it vulnerable to shifts in the ground surface. In addition, various processes at PLTP cause vibrations which can increase the r...
Saved in:
Main Author: | Mabruroh, Silvia |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/81708 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
A MODIFIED NON- ISOTHERMAL LUMPED PARAMETER MODEL IN POROUS MEDIA FOR LUMUT BALAI GEOTHERMAL FIELD
by: Firanda, Eric -
MAPPING OF THE LUMUT BALAI GEOTHERMAL POWER PLANT (GPP)
by: Makarim, Hafidh -
STUDY OF GEOTHERMAL STEAM PURITY IN GEOTHERMAL POWER PLANT
by: Wilantara, Bayu -
Design of Steam Production Facility Piping System at the Geothermal Power Plant System Case Study: Dieng Geothermal Power Plant
by: Setiadi, Farid -
UNIT 2 KAMOJANG GEOTHERMAL POWER PLANT UP-RATED
by: Ambarita, Ervant