THE OPTIMATION OF COAL PASS SYSTEM FOR ACHIEVING THREE MILLION TONS/YEAR IN KERTAPATI PIER, PT BUKIT ASAM (PERSERO) TBK

Kertapati pier is one of the unit operations of PT Bukit Asam (Persero) Tbk, which handles the final processing and shipment of coal to the barge. Starting in 2008, production of passing coal at Kertapati Pier is gradually increased from 2.5 million tonnes to 2.7 million tonnes per year until the...

Full description

Saved in:
Bibliographic Details
Main Author: Mirta Yusianto, Andik
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/81806
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:81806
spelling id-itb.:818062024-07-04T09:24:28ZTHE OPTIMATION OF COAL PASS SYSTEM FOR ACHIEVING THREE MILLION TONS/YEAR IN KERTAPATI PIER, PT BUKIT ASAM (PERSERO) TBK Mirta Yusianto, Andik Indonesia Final Project factors of pass production, productivity, tool main pier INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/81806 Kertapati pier is one of the unit operations of PT Bukit Asam (Persero) Tbk, which handles the final processing and shipment of coal to the barge. Starting in 2008, production of passing coal at Kertapati Pier is gradually increased from 2.5 million tonnes to 2.7 million tonnes per year until the end of 2014. To follow the increase of production, Kertapati Pier should be able to prepare existing facilities and infrastructure. Based on conducted research know the pass productivity of pier today is 503.7 tons / hour with 15 hours of effective working hours, this rate is still below the target of productivity that can be achieved from the installation conditions of 1000 tons / hour by hours worked effectively dismantling of 12 hours. It happened due to less optimal loading of the existing production process, a decrease in production capacity of some tools are not ideal conditions during the production activity takes place. So to increase the pass production target, in this research is done by analyzing the maximum productivity tool and then made several attempts to achieve production of 3 million tons / year. Based on the analysis of production factors, know that to achieve the target at 3 million tons can be done by: optimizing load production processes with use of the principle of match factor, adding and Mannering of coal by added 29% coal from the current state of 2,144,268 tons, the addition and supervision of laborer, from 4 people to 6 people and make the most of the production plan. It was found that the optimal value at a daily production plan for achieving 3 million tons / year amounting to 12.6 hours for the production of demolition and 14 hours for production of shipments. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Kertapati pier is one of the unit operations of PT Bukit Asam (Persero) Tbk, which handles the final processing and shipment of coal to the barge. Starting in 2008, production of passing coal at Kertapati Pier is gradually increased from 2.5 million tonnes to 2.7 million tonnes per year until the end of 2014. To follow the increase of production, Kertapati Pier should be able to prepare existing facilities and infrastructure. Based on conducted research know the pass productivity of pier today is 503.7 tons / hour with 15 hours of effective working hours, this rate is still below the target of productivity that can be achieved from the installation conditions of 1000 tons / hour by hours worked effectively dismantling of 12 hours. It happened due to less optimal loading of the existing production process, a decrease in production capacity of some tools are not ideal conditions during the production activity takes place. So to increase the pass production target, in this research is done by analyzing the maximum productivity tool and then made several attempts to achieve production of 3 million tons / year. Based on the analysis of production factors, know that to achieve the target at 3 million tons can be done by: optimizing load production processes with use of the principle of match factor, adding and Mannering of coal by added 29% coal from the current state of 2,144,268 tons, the addition and supervision of laborer, from 4 people to 6 people and make the most of the production plan. It was found that the optimal value at a daily production plan for achieving 3 million tons / year amounting to 12.6 hours for the production of demolition and 14 hours for production of shipments.
format Final Project
author Mirta Yusianto, Andik
spellingShingle Mirta Yusianto, Andik
THE OPTIMATION OF COAL PASS SYSTEM FOR ACHIEVING THREE MILLION TONS/YEAR IN KERTAPATI PIER, PT BUKIT ASAM (PERSERO) TBK
author_facet Mirta Yusianto, Andik
author_sort Mirta Yusianto, Andik
title THE OPTIMATION OF COAL PASS SYSTEM FOR ACHIEVING THREE MILLION TONS/YEAR IN KERTAPATI PIER, PT BUKIT ASAM (PERSERO) TBK
title_short THE OPTIMATION OF COAL PASS SYSTEM FOR ACHIEVING THREE MILLION TONS/YEAR IN KERTAPATI PIER, PT BUKIT ASAM (PERSERO) TBK
title_full THE OPTIMATION OF COAL PASS SYSTEM FOR ACHIEVING THREE MILLION TONS/YEAR IN KERTAPATI PIER, PT BUKIT ASAM (PERSERO) TBK
title_fullStr THE OPTIMATION OF COAL PASS SYSTEM FOR ACHIEVING THREE MILLION TONS/YEAR IN KERTAPATI PIER, PT BUKIT ASAM (PERSERO) TBK
title_full_unstemmed THE OPTIMATION OF COAL PASS SYSTEM FOR ACHIEVING THREE MILLION TONS/YEAR IN KERTAPATI PIER, PT BUKIT ASAM (PERSERO) TBK
title_sort optimation of coal pass system for achieving three million tons/year in kertapati pier, pt bukit asam (persero) tbk
url https://digilib.itb.ac.id/gdl/view/81806
_version_ 1822997450278830080