DETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81823 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:81823 |
---|---|
spelling |
id-itb.:818232024-07-04T10:01:08ZDETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY Mahendra Putra, Alessandro Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/81823 text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
|
format |
Final Project |
author |
Mahendra Putra, Alessandro |
spellingShingle |
Mahendra Putra, Alessandro DETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY |
author_facet |
Mahendra Putra, Alessandro |
author_sort |
Mahendra Putra, Alessandro |
title |
DETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY |
title_short |
DETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY |
title_full |
DETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY |
title_fullStr |
DETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY |
title_full_unstemmed |
DETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY |
title_sort |
determination of inspection interval and method for piping and pressure vessel on upstream oil and gas facility case study : lawe-lawe facility |
url |
https://digilib.itb.ac.id/gdl/view/81823 |
_version_ |
1822997455825797120 |