DETERMINATION OF INSPECTION INTERVAL AND METHOD FOR PIPING AND PRESSURE VESSEL ON UPSTREAM OIL AND GAS FACILITY CASE STUDY : LAWE-LAWE FACILITY
Saved in:
Main Author: | Mahendra Putra, Alessandro |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/81823 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
Risk Based Inspection Analysis in pressurized equipment in Upstream Production Facility
by: Mogalana, Aldi -
INSPECTION PLANNING ON OIL AND GAS UPSTREAM FACILITYâS EQUIPMENT BASED ON DAMAGE MECHANISM AND REMAINING LIFE CASE STUDY: UPSTREAM FACILITY SANTAN FIELD
by: Ben Loda, Kevin -
REDUCE UNPLANNED SHUTDOWN ON SURFACE FACILITIES OF OIL AND GAS PLANT PROCESS â IN THE CASE OF PERTAMINA UPSTREAM OIL AND GAS BUSINESS
by: Rahmat Supriyadi, Yedi -
THE DESIGN OF PRESSURE VESSEL FOR AMINE REGENERATION UNIT AT THE FACILITY OF GAS PROCESSING BALUN FIELD
by: Lumbantobing, Hardi -
IMPROVING AN EXISTING SEPARATOR (PRESSURE VESSEL) FOR OIL AND GAS PRODUCTION FACILITY USING ASME SECTION VIII DIV. 2 WITH 1320 PSIG OPERATING PRESSURE AND 31,9 M^3 CAPACITY
by: Naufal, Rayhan