WELL CANDIDATE SELECTION FOR MATURE FIELD OPTIMIZATION: CASE STUDY OF MATURE FIELD
Indonesia is targeting production of 1 million barrels of oil per day by 2030 by drilling more than 1,000 wells per year and reactivating inactive wells in a second batch. This effort involves analyzing the reactivation of idle wells based on remaining oil reserves and production track records to id...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/82019 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |