WELL CANDIDATE SELECTION FOR MATURE FIELD OPTIMIZATION: CASE STUDY OF MATURE FIELD

Indonesia is targeting production of 1 million barrels of oil per day by 2030 by drilling more than 1,000 wells per year and reactivating inactive wells in a second batch. This effort involves analyzing the reactivation of idle wells based on remaining oil reserves and production track records to id...

Full description

Saved in:
Bibliographic Details
Main Author: Ayu Irfani, Wilda
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/82019
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items