STUDY ON THE IMPLEMENTATION OF TAKT PLANNING IN THE SUPERSTRUCTURE WORK OF THE LABTEK XV ITB BUILDING CONSTRUCTION PROJECT
Production planning and control are major contributors to creating efficient and well-executed construction projects. As the construction industry continues to grow and become more complex each year, lean construction communities have been striving to develop tools and concepts aimed at improving wo...
Saved in:
Main Author: | Aaliyah Setiawan, Putri |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/82403 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
STUDY OF CONTRACTORâS POTENTIAL TO IMPLEMENT TAKT PRODUCTION (CASE STUDY OF 2 BUILDING PROJECTS)
by: Nugraha, Pradipta -
DIGITALISATION OF PRODUCTION PLANNING FOR TAKT PRODUCTION SYSTEM
by: Muhammad, Fandhika -
EVALUATION STUDY ON THE POTENTIAL IMPLEMENTATION OF LOCATION BASED PLANNIG SYSTEM (LBPS) AS A PROJECT SCHEDULLING TOOLS. CASE STUDY : UNDERGRAOUND STRUCTURE WORK OF LABTEK XV DEVELOPMENT PROJECT, BANDUNG INSTITUTE OF TECHNOLOGY
by: Patricia J. Tampubolon, Audrey -
SEISMIC EVALUATION AND RETROFIT OF LABTEK VII ITB WITH BASE ISOLATION
by: Naomi Br. Pardede, Inda -
CFD Simulation of Wind-Driven Rain on the Labtek II FMAE ITB Building with Eulerian Multiphase Model
by: Irfan Fadhlurrahman, Muhammad