ECONOMIC EVALUATION OF PT XYZ’S UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD

The sub-level stoping gold mining method involves filling material into the stope that has been mined, making operating costs for mining even higher. The general approach to economic evaluation using the Discounted Cash Flow method is deemed insufficient to assess the economics, so other methods...

Full description

Saved in:
Bibliographic Details
Main Author: Fauzan Pulungan, Aqsal
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/82701
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:82701
spelling id-itb.:827012024-07-09T17:58:27ZECONOMIC EVALUATION OF PT XYZ’S UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD Fauzan Pulungan, Aqsal Indonesia Final Project Economic evaluation, Discounted Cash Flow, Sensitivity Analysis, Real Option Valuation, Binomial Lattice, Rainbow Option INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/82701 The sub-level stoping gold mining method involves filling material into the stope that has been mined, making operating costs for mining even higher. The general approach to economic evaluation using the Discounted Cash Flow method is deemed insufficient to assess the economics, so other methods are needed that can consider uncertainty factors and can provide information on the magnitude of the opportunity for the project value. The Real Option Valuation (ROV) method using Binomial Lattice and Rainbow Option has management flexibility to overcome uncertainties that may occur. The evaluation begins with the DCF method which will produce Net Present Value and Internal Rate of Return. From the sensitivity analysis carried out on the parameters of commodity selling prices and operating costs, it will show changes in the economic value of PT XYZ's mine that occur if the parameters mentioned change. The economic evaluation will continue using the ROV method using Binomial Lattice and Rainbow Option to determine the economic value of the project. The DCF method produces a project NPV of IDR 974,722,524,327.78 with an IRR of 37.8%. Sensitivity analysis shows that selling price is the most sensitive parameter and operating costs are very dependent on inflation. Based on the Binomial Lattice approach for historical data for the last 6 years and 12 years, the project has an option premium on the commodity selling price parameter of IDR 105,282,837,167.87 and IDR 220,419,855,122.98, while based on the inflation parameter the option premium value is IDR 176. 146,333,615.87 and Rp. 197,293,476,530.02. The project also has an option premium based on the Raibow Option on historical data on selling prices and inflation for the last 12 years amounting to IDR 541,498,207,763.06 and historical data on selling prices and inflation for 6 years amounting to IDR 760,457,902,352.72. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The sub-level stoping gold mining method involves filling material into the stope that has been mined, making operating costs for mining even higher. The general approach to economic evaluation using the Discounted Cash Flow method is deemed insufficient to assess the economics, so other methods are needed that can consider uncertainty factors and can provide information on the magnitude of the opportunity for the project value. The Real Option Valuation (ROV) method using Binomial Lattice and Rainbow Option has management flexibility to overcome uncertainties that may occur. The evaluation begins with the DCF method which will produce Net Present Value and Internal Rate of Return. From the sensitivity analysis carried out on the parameters of commodity selling prices and operating costs, it will show changes in the economic value of PT XYZ's mine that occur if the parameters mentioned change. The economic evaluation will continue using the ROV method using Binomial Lattice and Rainbow Option to determine the economic value of the project. The DCF method produces a project NPV of IDR 974,722,524,327.78 with an IRR of 37.8%. Sensitivity analysis shows that selling price is the most sensitive parameter and operating costs are very dependent on inflation. Based on the Binomial Lattice approach for historical data for the last 6 years and 12 years, the project has an option premium on the commodity selling price parameter of IDR 105,282,837,167.87 and IDR 220,419,855,122.98, while based on the inflation parameter the option premium value is IDR 176. 146,333,615.87 and Rp. 197,293,476,530.02. The project also has an option premium based on the Raibow Option on historical data on selling prices and inflation for the last 12 years amounting to IDR 541,498,207,763.06 and historical data on selling prices and inflation for 6 years amounting to IDR 760,457,902,352.72.
format Final Project
author Fauzan Pulungan, Aqsal
spellingShingle Fauzan Pulungan, Aqsal
ECONOMIC EVALUATION OF PT XYZ’S UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD
author_facet Fauzan Pulungan, Aqsal
author_sort Fauzan Pulungan, Aqsal
title ECONOMIC EVALUATION OF PT XYZ’S UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD
title_short ECONOMIC EVALUATION OF PT XYZ’S UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD
title_full ECONOMIC EVALUATION OF PT XYZ’S UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD
title_fullStr ECONOMIC EVALUATION OF PT XYZ’S UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD
title_full_unstemmed ECONOMIC EVALUATION OF PT XYZ’S UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD
title_sort economic evaluation of pt xyz’s underground sub-level stope mine using discounted cash flow and real option analysis method
url https://digilib.itb.ac.id/gdl/view/82701
_version_ 1822009854365007872