ECONOMIC EVALUATION OF PT XYZâS UNDERGROUND SUB-LEVEL STOPE MINE USING DISCOUNTED CASH FLOW AND REAL OPTION ANALYSIS METHOD
The sub-level stoping gold mining method involves filling material into the stope that has been mined, making operating costs for mining even higher. The general approach to economic evaluation using the Discounted Cash Flow method is deemed insufficient to assess the economics, so other methods...
Saved in:
Main Author: | Fauzan Pulungan, Aqsal |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/82701 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ECONOMIC EVALUATION OF UNDERGROUND GOLD MINING METHOD SUBLEVEL STOPING AT PT XYZ USING DISCOUNTED CASH FLOW METHOD, SENSITIVITY ANALYSIS, MONTE CARLO SIMULATION, AND REAL OPTIONS METHOD USING BINOMIAL LATTICE AND RAINBOW OPTION APPROACH
by: Evangline Halim, Challista -
ECONOMIC EVALUATION OF UNDERGROUND GOLD MINING WITH SUBLEVEL STOPING METHOD AT PT XYZ: COMPARISON OF DISCOUNTED CASH FLOW MODEL, MONTE CARLO SIMULATION, AND REAL OPTION ANALYSIS THROUGH BINOMIAL LATTICE AND BLACK-SCHOLES APPROACH
by: Putra, Jeffri -
ECONOMIC EVALUATION OF UNDERGROUND GOLD MINING WITH SHRINKAGE STOPING METHOD AT PT XYZ USING DISCOUNTED CASH FLOW METHOD, MONTE CARLO SIMULATION, AND REAL OPTION ANALYSIS WITH BINOMIAL LATTICE AND FUZZY BINOMIAL LATTICE APPROACHES
by: Aditya Nurrahman, Naufal -
THE ECONOMIC EVALUATION OF THE UNDERGROUND GOLD MINING PROJECT SHRINKAGE STOPING IN PT XYZ USING THE REAL OPTIONS METHOD
by: Nuroktaviani, Dinda -
ECONOMIC ANALYSIS OF COAL MINING PROJECT USING DISCOUNTED CASH FLOW AND REAL OPTION VALUATION METHOD
by: Sukmara Krisna, Okto