REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND
The Meninting River Basin (DAS Meninting) has a high potential for water availability, but the southern part of Lombok Island has limited water availability despite having extensive agricultural land potential. Therefore, the Meninting Dam was constructed to align the potential water availability wi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/82746 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |