REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND

The Meninting River Basin (DAS Meninting) has a high potential for water availability, but the southern part of Lombok Island has limited water availability despite having extensive agricultural land potential. Therefore, the Meninting Dam was constructed to align the potential water availability wi...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلف الرئيسي: Azis Ghifari, Mochammad
التنسيق: Final Project
اللغة:Indonesia
الموضوعات:
الوصول للمادة أونلاين:https://digilib.itb.ac.id/gdl/view/82746
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
المؤسسة: Institut Teknologi Bandung
اللغة: Indonesia
id id-itb.:82746
spelling id-itb.:827462024-07-11T14:24:03ZREDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND Azis Ghifari, Mochammad Angkutan air, udara & ruang angkasa Indonesia Final Project River Basin , Dam Failure, Main Dam , Flood Modeling INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/82746 The Meninting River Basin (DAS Meninting) has a high potential for water availability, but the southern part of Lombok Island has limited water availability despite having extensive agricultural land potential. Therefore, the Meninting Dam was constructed to align the potential water availability with the available land on Lombok Island. The Meninting Dam also poses a potential hazard if it experiences a dam failure, given its proximity to the densely populated city of Mataram. Based on hydrological analysis, the main dam is designed with a planned flood discharge of Q1000 and QPMF. The dam structure is planned to have a height of 86 meters and a crest width of 16 meters, with a dead storage elevation of 167 meters, effective storage of 203.5 meters, and a dam crest of 209 meters. Flood modeling due to dam failure using the HEC-RAS. As a result, 20 villages/urban areas are potentially affected by the flood. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Angkutan air, udara & ruang angkasa
spellingShingle Angkutan air, udara & ruang angkasa
Azis Ghifari, Mochammad
REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND
description The Meninting River Basin (DAS Meninting) has a high potential for water availability, but the southern part of Lombok Island has limited water availability despite having extensive agricultural land potential. Therefore, the Meninting Dam was constructed to align the potential water availability with the available land on Lombok Island. The Meninting Dam also poses a potential hazard if it experiences a dam failure, given its proximity to the densely populated city of Mataram. Based on hydrological analysis, the main dam is designed with a planned flood discharge of Q1000 and QPMF. The dam structure is planned to have a height of 86 meters and a crest width of 16 meters, with a dead storage elevation of 167 meters, effective storage of 203.5 meters, and a dam crest of 209 meters. Flood modeling due to dam failure using the HEC-RAS. As a result, 20 villages/urban areas are potentially affected by the flood.
format Final Project
author Azis Ghifari, Mochammad
author_facet Azis Ghifari, Mochammad
author_sort Azis Ghifari, Mochammad
title REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND
title_short REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND
title_full REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND
title_fullStr REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND
title_full_unstemmed REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND
title_sort redesign of the main dam and dam break modeling of meninting dam, lombok island
url https://digilib.itb.ac.id/gdl/view/82746
_version_ 1823656495139520512