REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND
The Meninting River Basin (DAS Meninting) has a high potential for water availability, but the southern part of Lombok Island has limited water availability despite having extensive agricultural land potential. Therefore, the Meninting Dam was constructed to align the potential water availability wi...
Saved in:
主要作者: | |
---|---|
格式: | Final Project |
語言: | Indonesia |
主題: | |
在線閱讀: | https://digilib.itb.ac.id/gdl/view/82746 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
成為第一個發表評論!