REDESIGN OF THE MAIN DAM AND DAM BREAK MODELING OF MENINTING DAM, LOMBOK ISLAND

The Meninting River Basin (DAS Meninting) has a high potential for water availability, but the southern part of Lombok Island has limited water availability despite having extensive agricultural land potential. Therefore, the Meninting Dam was constructed to align the potential water availability wi...

全面介紹

Saved in:
書目詳細資料
主要作者: Azis Ghifari, Mochammad
格式: Final Project
語言:Indonesia
主題:
在線閱讀:https://digilib.itb.ac.id/gdl/view/82746
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!