STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG

Clean water distribution plays an important role in meeting the clean water needs of the community and the private sector, the use of clean water distribution pipes is the choice used by most water supply companies, including the Regional Public Water Supply Company (PERUMDAM). In the water distribu...

Full description

Saved in:
Bibliographic Details
Main Author: Falah Aryasatya, Muhammad
Format: Final Project
Language:Indonesia
Subjects:
Online Access:https://digilib.itb.ac.id/gdl/view/83241
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:83241
spelling id-itb.:832412024-08-06T09:00:04ZSTRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG Falah Aryasatya, Muhammad Teknik (Rekayasa, enjinering dan kegiatan berkaitan) Indonesia Final Project Finite Element Method, SAP2000, Design+, Incremental Launching, LFRD. INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/83241 Clean water distribution plays an important role in meeting the clean water needs of the community and the private sector, the use of clean water distribution pipes is the choice used by most water supply companies, including the Regional Public Water Supply Company (PERUMDAM). In the water distribution process there are several cases that need to be considered, as in this case is the distribution of water across the river through a pipe bridge. By considering the river span and frame structure of this DN 1000 clean water pipe bridge, it is necessary to analyze the bridge frame structure and the construction of the distribution pipes used in this case. This study aims to analyze the structure, connections, and installation methods of a truss bridge designed to support the DN 1000 water pipeline in Tangerang. The bridge is 132 meters long with four supports that will support a 1-meter diameter pipe, crossing a river to distribute clean water from its source to areas in need. This study was conducted considering the importance of reliable infrastructure to ensure efficient and sustainable clean water supply. With the results of the analysis carried out, the safety ratio of the bridge structure is 0.3468, this value is still below 1 so it shows that the structural modeling is safe. Furthermore, the connection used is an angle welding connection and bolts, and the installation method determined is the incremental launching system. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
topic Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
spellingShingle Teknik (Rekayasa, enjinering dan kegiatan berkaitan)
Falah Aryasatya, Muhammad
STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG
description Clean water distribution plays an important role in meeting the clean water needs of the community and the private sector, the use of clean water distribution pipes is the choice used by most water supply companies, including the Regional Public Water Supply Company (PERUMDAM). In the water distribution process there are several cases that need to be considered, as in this case is the distribution of water across the river through a pipe bridge. By considering the river span and frame structure of this DN 1000 clean water pipe bridge, it is necessary to analyze the bridge frame structure and the construction of the distribution pipes used in this case. This study aims to analyze the structure, connections, and installation methods of a truss bridge designed to support the DN 1000 water pipeline in Tangerang. The bridge is 132 meters long with four supports that will support a 1-meter diameter pipe, crossing a river to distribute clean water from its source to areas in need. This study was conducted considering the importance of reliable infrastructure to ensure efficient and sustainable clean water supply. With the results of the analysis carried out, the safety ratio of the bridge structure is 0.3468, this value is still below 1 so it shows that the structural modeling is safe. Furthermore, the connection used is an angle welding connection and bolts, and the installation method determined is the incremental launching system.
format Final Project
author Falah Aryasatya, Muhammad
author_facet Falah Aryasatya, Muhammad
author_sort Falah Aryasatya, Muhammad
title STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG
title_short STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG
title_full STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG
title_fullStr STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG
title_full_unstemmed STRUCTURAL AND CONNECTION ANALYSIS AND INSTALLATION METHOD OF TRUSS BRIDGE FOR DN 1000 WATER PIPE IN TANGERANG
title_sort structural and connection analysis and installation method of truss bridge for dn 1000 water pipe in tangerang
url https://digilib.itb.ac.id/gdl/view/83241
_version_ 1822998042112950272