PLASTIC ZONE PREDICTION USING FINITE ELEMENT METHOD ON CIKONENG DECLINE TUNNEL AT PT. CIBALIUNG SUMBERDAYA.
Underground Mining activity will always face deformation and instability of the rock mass around the underground openings. A large deformation was reported to occur on decline tunnel of PT. Cibaliung Sumberdaya (PT. CSD). Prior to this event, the same problem occured at the same tunnel, which the...
Saved in:
Main Author: | Pangacella Putra, Bayurohman |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83372 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GOLD AND SILVER RECOVERY FROM SOLUTION TAILING OF PT CIBALIUNG SUMBERDAYA USING RESIN IN COLUMN METHOD
by: Simanjuntak, Ricardi -
REKOVERI EMAS DAN PERAK DARI LARUTAN TAILING PT CIBALIUNG SUMBERDAYA DENGAN METODE RESIN IN COLUMN (RIC)
by: Simanjuntak, Ricardi -
Stability Analysis of Mine Opening at Mine Decline by 3 Dimensional Finite Element Method
by: Arfan Dermawan Ikhsan, Muh -
CONSTRUCTION OF CHARACTERISTICS CURVE TUNNEL ADVANCED USING THREE-DIMENSIONAL FINITE ELEMENT METHODE
by: PUTRA SUKARTO SURBAKTI (NIM : 12113070), SAMUELSON -
Finite element method in cooling analysis and design of plastic injection moulds
by: SUN YIFENG
Published: (2010)