PERANCANGAN PERBAIKAN LEAD TIME PERAKITAN PADA DIVISI FABRIKASI PT X DENGAN MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING
PT X is a company engaged in the heavy equipment manufacturing sector. The company produces heavy equipment attachments. In carrying out the production process, PT X has several divisions within the production department, one of which is the Fabrication Division. This division has a business proc...
Saved in:
Main Author: | Fathahillah Shidiq, Ahmad |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83377 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
PENDEKATAN LEAN MANUFACTURING UNTUK MENGURANGI PEMBOROSAN (WASTE) PADA PROSES PRODUKSI CARBODY DI DIVISI FABRIKASI PT. INKA (PERSERO) MADIUN MENGGUNAKAN METODE VALSAT
by: NIDA CHOFIYA ALFIANI, 041211233167
Published: (2017) -
PERANCANGAN LINTAS PERAKITAN OVERHEAD LINE DENGAN PENDEKATAN LEAN MANUFACTURING DALAM PROSES PRODUKSI BMW X1 (F48) DI PT GAYA MOTOR
by: APRILIANO YOSANDI NIM 13414059, YASSER -
PERANCANGAN PENUGASAN OPERATOR PADA LINTAS PERAKITAN PRODUK EXCAVA 200 DIVISI ALAT BERAT PT PINDAD MENGGUNAKAN ALGORITMA GENETIKA
by: Al Fattah, Viqri -
Perancangan Tata Letak Fasilitas untuk Fabrikasi
Mesin CNC Batik Tulis Menggunakan Pendekatan
Systematic Layout Planning
by: Saifurrahman, Anas, et al.
Published: (2020) -
PENGEMBANGAN ALGORITMA METAHEURISTIK SIMULATED ANNEALING UNTUK PERANCANGAN LINTAS PERAKITAN DENGAN ALTERNATIF URUTAN PERAKITAN DAN PROSES PERAKITAN MENGGUNAKAN KOLABORASI MANUSIA-ROBOT
by: Puspa Miranti, Evita