PERANCANGAN PERBAIKAN LEAD TIME PERAKITAN PADA DIVISI FABRIKASI PT X DENGAN MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING
PT X is a company engaged in the heavy equipment manufacturing sector. The company produces heavy equipment attachments. In carrying out the production process, PT X has several divisions within the production department, one of which is the Fabrication Division. This division has a business proc...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/83377 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!